June 6

3 PM

15 Terminal Road
Brunswick, ME

Join us for a walking tour of the 1.5 MW solar array at the Midcoast Regional Redevelopment Authority (MRRA). In 2017 MRRA installed 4,576 panels on the old Naval Air Station in Brunswick.

This system is designed to provide 13.3 percent of Brunswick Landing’s annual electric load from on-site renewable energy. The electricity from the system will add to what’s generated by the anaerobic digester biogas plant on the campus, producing enough sustainable energy to power nearly the entire site, eliminating more than 2 million pounds of CO2 emissions annually.

Come see the panels up close and learn more about how clean energy works! For more information please contact Jill at [email protected] or 207.221.6342